Unique technique for quick house building: use recycled plastic moulds structures to pour a mortar mix. The work is claimed to be done in one day (four hours to setup the mold structure, two hours to fill it), then needs 7 days to strengthen.

Each modular plastic panel is 30x30cm, can be reused up to 50 times, and the wall thickness vary between 100 and 150mm. The current system considers the inclusion of the doors, windows, toilet and kitchen system. The electrical and plumbing systems are (somehow) integrated in the mold structure.

Founded in 1986 by Hennie Botes in South Africa, moladi came to birth with this solution to the answer the critical situation of housing, combined with the lack of skills. The assembling process is apparently extremely easy, especially considering the overall timespan of a brick construction. Hennie Botes claims indeed that “over 90% of a construction team on a moladi housing site consists of unskilled labourers”.

Monday, January 27, 2014

World Design Capital - moladi showcase innovation

World Design Capital - moladi showcase

World Design Capital Cape 2014
World Design Capital Cape
Town 2014

We are very excited and proud to have been invited to showcase moladi
innovative building technology at the prestigious World Design Capital Cape
Town 2014.

Design Indaba will feature moladi in a large exhibition called "Africa is
Now", which will take place at the Design Indaba Expo to be hosted in Cape
Town from the 28 Feb-2 March 2014. The Design Indaba is the largest
design/innovation event in the Southern Hemisphere and attracts close to 50 000
local and international visitors. This includes 500 buyers from South Africa,
Africa and around the world, major media partners such as the Sunday Times,
Mail & Guardian, eTV, Wallpaper magazine and
dezeen.com, as well as
government officials and dignitaries from South Africa, Africa and beyond, and
entrepreneurs and creative small-business owners.


It is a curated show that Design Indaba has initiated. This is a
prestigious exhibition to be part of and a rare opportunity to showcase our
product at the expo. Fifty five products from across Africa have been chosen,
of which only fifteen are from South Africa and moladi being one.

The "Africa Is Now" exhibition: It is a specially curated area
within the expo and will occupy a central position on the expo floor. It is
expect to attract a lot of interest from the media, design community and
public. It covers the latest developments in craft, technology, fashion,
furniture, architecture, and social impact projects from all over Africa.

More info about moladi is available here - moladi

More info about - World Design Capital Cape Town 2014

Keywords - moladi, World Design Capital, Cape Town, 2014, innovation, Africa is now, Africa, building people, Design Indaba, exhibit, showcase, technology

Saturday, January 25, 2014

Innovative building technologies moladi

Innovative building technologies

Alternative and Innovative Building Technologies

Technology to deliver in the twenty first century - Housing

For more information - Visit www.moladi.com

Keywords - moladi, Innovative building technologies, ABT, IBT, building, technologies, construction technology, plastic formwork, technology, prefab, prefabricated, steel frame, CSIR, Agrément Certificate, housing